Works and technical

Body: 

Works have been done and some are going on, for the following roads.

Repair Kabirisi road (0.71km)

Kyanamira – Egarama (1.2km)

Bunyarigi P/S – Kayonjo – Rwakatwe (2.3km)

Rwenjeru C.O.U – Akasusano I (1.2km)

Kyanamira – Egarama (1.2km)

Kyeitembe Voc. –Matsya road (3.0km)

Katakondwa – Kanyantama (opening and swamp filling 0.4km)

Liberation - Keirere road (2.0km)

Rukindo - Nyarwanya road  (1.2km)

Emergency works on Ihaama - Kyambubaire road  (swamp filling  200meters  and opening road 

Road design St. Kagwa  - Omuruhiita – Kichwaba – Rwemirokora  (6.5km)