Works and technical
Works have been done and some are going on, for the following roads.
Repair Kabirisi road (0.71km)
Kyanamira – Egarama (1.2km)
Bunyarigi P/S – Kayonjo – Rwakatwe (2.3km)
Rwenjeru C.O.U – Akasusano I (1.2km)
Kyanamira – Egarama (1.2km)
Kyeitembe Voc. –Matsya road (3.0km)
Katakondwa – Kanyantama (opening and swamp filling 0.4km)
Liberation - Keirere road (2.0km)
Rukindo - Nyarwanya road (1.2km)
Emergency works on Ihaama - Kyambubaire road (swamp filling 200meters and opening road
Road design St. Kagwa - Omuruhiita – Kichwaba – Rwemirokora (6.5km)